EMERALD CRITICAL POWER DESIGN TOOL

Emerald Critical Power Designer

Build a preliminary backup power solution covering UPS, batteries, generator support, solar PV, inverter capacity and design next steps.

Flagship Planning Tool

Build a connected power, backup and energy strategy.

Step 1 / Solution Type

Step 2 / Site & Load Details

Step 3 / UPS & Battery Requirements

Step 4 / Generator Requirements

Step 5 / Solar & Battery Requirements

Emerald Technical Review

Acceptable DesignUPS loading: 93,75%

The preliminary design appears workable, but spare capacity is limited. Review future expansion and final equipment data.

Remaining UPS capacity
5,0 kVA
Remaining UPS percentage
6,25%

Future Capacity

UPS capacity used
93,75%
Remaining UPS kVA
5,0 kVA
Remaining UPS percentage
6,25%

Limited spare capacity. Consider next UPS size where future growth is expected.

Recommended UPS Equipment

UPS: 80 kVA Online UPS

Battery: 2 strings / 80 x 12V 100Ah

Estimated runtime: 36 minutes

Input protection: 160 A MCCB / breaker estimate

Generator support: 100 kVA starting point

Recommended Generator Equipment

Standby generator rating: 100 kVA

Estimated prime planning rating: 90 kVA

Fuel estimate: 13,0 L/hour

Runtime fuel required: 104,0 L

Fuel cost estimate: R 3 224

Indicative fuel tank: 500 L

Estimated runtime from tank: 38,5 hours

Fuel tank sizing must consider usable tank volume, refuelling access, regulations and site layout.

Recommended Solar Equipment

PV array: 75,0 kWp

Inverter: 60,0 kW

DC/AC ratio: 1,25

Estimated panels: 125 x 600W modules

Roof area estimate: 300,0 m²

Estimated daily yield: 304,2 kWh/day

Estimated annual yield: 111 033 kWh/year

Battery storage: 100 kWh

Estimated backup: 5,4 hours

Professional Design Next Steps

1

Online estimate reviewed

2

Site inspection

3

Load measurement / load profile

4

Electrical assessment

5

PV*SOL simulation

6

UPS and battery runtime verification

7

Generator compatibility review

8

Cable, breaker and protection design

9

Final Emerald technical proposal

Design Confidence

100%

High confidence preliminary estimate

Needs confirmation

  • Site inspection
  • Measured load profile
  • Equipment manufacturer data
  • Cable route and DB information
  • Roof layout / shading

Technical Notes

  • Preliminary estimate only
  • UPS runtime to be verified against manufacturer discharge tables
  • Generator sizing to consider motor starting, load steps and derating
  • Solar design to be verified with roof layout, shading and PV*SOL modelling
  • Final design to comply with SANS 10142 and applicable municipal / SSEG requirements

Detailed System Design

Request Detailed Emerald Design

Send this preliminary design to Emerald and our team can assist with site inspection, PV*SOL modelling, UPS runtime verification, generator sizing, cable sizing, protection design and a formal technical proposal.

Optional contact details

Add your details if you would like Emerald to review this preliminary design.