Battery Selection: The battery quantity is estimated from usable stored energy and required runtime. Final runtime must be confirmed against the UPS and battery manufacturer discharge data.
High-Rate Runtime Correction: UPS battery runtime is corrected for high-rate discharge. Actual runtime must be confirmed against the battery manufacturer discharge tables at the required end voltage and discharge current.
Runtime Scaling: Runtime is scaled by battery string count. This provides a planning estimate only. Final runtime must be confirmed against the UPS and battery manufacturer discharge tables.
Battery String Quantity: Battery block quantity depends on the UPS model and approved DC voltage range. Always confirm the allowable battery string quantity with the UPS manufacturer before final battery design.
Generator Support: Suggested generator starting point: 100 kVA. Generator support must consider UPS rectifier behaviour, battery recharge current, nonlinear loads, load step response, harmonics, altitude and ambient temperature.
Electrical Distribution: Indicative supply breaker: 125 A. Breaker and cable sizing must be coordinated with the final UPS model, cable installation method, voltage drop, fault level and discrimination requirements.