Corporate UPS Upgrade

Delivering resilient critical infrastructure designed for reliability, operational continuity and long-term performance.

Corporate UPS Upgrade
Technical Case Study

01 / Project Overview

Project Overview

High-availability UPS modernisation designed to strengthen resilience and minimise business disruption.

Emerald approached the project as a complete technical delivery, balancing site conditions, operational risk, installation readiness and long-term maintainability.

02 / Client Challenge

The Challenge

The client required dependable backup power for critical operations, with careful consideration of existing infrastructure, shutdown constraints, battery autonomy, commissioning requirements and long-term serviceability.

03 / Emerald Solution

Our Solution

A structured technical approach ensured the system was planned, delivered, tested and handed over with uptime and operational continuity at the centre.

01

Technical Site Assessment

Review the operating environment, connected loads, existing infrastructure, risk profile and site constraints.

02

Equipment Selection

Select appropriate power, energy, electrical or supporting infrastructure around resilience and maintainability.

03

Installation

Coordinate installation activities with safety controls, shutdown planning and minimal operational disruption.

04

Testing & Commissioning

Validate system performance, document the installation and hand over a reliable operational asset.

04 / Scope

Scope of Works

UPS replacement
Battery installation
Electrical integration
Testing and commissioning
Site assessment
System design
Equipment supply
Installation
Testing
Commissioning
Documentation
Client handover

05 / Equipment

Equipment & Technologies

Primary Equipment

Delta DPH 120kVA UPS

UPS Architecture

Modular UPS power architecture

Battery System

12V 200Ah battery system

Integration

Electrical integration and commissioning

06 / Gallery

Image 1 of 5

07 / Outcomes

Project Outcomes

Restored backup power confidence and improved system maintainability.

Improved Reliability

Reduced Downtime

Enhanced Maintainability

Operational Continuity

Future Expansion Ready

Successfully Commissioned

Project Technical DetailDetailed Project Scope
Replacement Scope
Existing UPS infrastructure was replaced with a modern modular UPS platform.
Battery Installation
The project included battery installation as part of the upgraded backup-power system.
Testing and Commissioning
Testing and commissioning were completed to validate system operation before handover.

Continue Exploring

View all projects →

START YOUR PROJECT

Planning Critical Infrastructure?

Whether you're upgrading existing systems or delivering a new installation, Emerald provides system design, supply, installation, commissioning and long-term maintenance support.

View More Projects